Growth & Analytics
Test changes, not opinions
Growth work that cannot be evaluated
The team ships changes, traffic moves, and nobody can separate the effect of the work from seasonality, a pricing change and a campaign that ran the same week. Experiments are called by whoever watched the dashboard most recently. Every initiative is reported as a success because no definition of failure was agreed beforehand. Without a measurement foundation, growth work becomes a sequence of plausible stories.
What we build
Find where growth actually leaks, then test changes that can be measured.
Funnel and retention diagnosis
Find out where the loss actually happens before proposing fixes.
- End-to-end funnel analysis by segment and channel
- Cohort retention curves and their shape over time
- Activation and first-value analysis
- Churn and expansion patterns by account type
- A ranked list of leaks by size and tractability
Experiment design
Set the test up so its result means something.
- A hypothesis with a pre-agreed success and failure condition
- Metric, sample and duration decided before launch
- Guardrail metrics to catch damage elsewhere
- Assignment and exposure logic that does not leak between variants
- A stopping rule, written down in advance
Reporting infrastructure
Shared definitions so results are not relitigated every time.
- Experiment results reported from one modelled source
- Segment and cohort definitions shared across teams
- Confidence and caveats stated with every result
- A record of past experiments, including the failures
- Dashboards that separate experiment effects from background trends
Growth operations
Make the loop repeatable rather than heroic.
- A backlog of tests ranked by expected value and effort
- A review cadence where results are actually read
- Instrumentation requests handled before a test ships
- Documentation of what has already been tried and ruled out
How the work runs
Discovery
Review the funnel, the retention curves and the existing reporting, and establish what the current data can and cannot support.
Diagnosis
Quantify the leaks by segment, rank them by size and tractability, and write down the hypotheses worth testing.
Build & test
Put the measurement and assignment infrastructure in place, then run the first experiments with pre-agreed stopping rules.
Review & iterate
Report results with their caveats, record the failures, retire disproven assumptions, and hand over the testing loop.
What you end up with
- Leaks are ranked by size rather than by who noticed them
- Every test has a pre-agreed success and failure condition
- Results are reported with confidence and caveats attached
- Disproven assumptions are recorded so they stop recurring
Typically in scope
- Product analytics and event data
- Data warehouse and modelling layer
- Experimentation and feature-flag tooling
- CRM and billing data
- Marketing and channel reporting
- Business intelligence and dashboards
Where this comes up most
What we will not automate
Scope boundaries agreed before the build starts, not discovered after launch.
Guaranteed growth
We build the diagnosis and the measurement loop. Nobody can promise a growth figure, and anyone quoting one is describing a different company's results.
Inconclusive results
If a test cannot reach a conclusion, we report it as inconclusive. Reinterpreting a flat result as a win is the fastest way to make the whole programme worthless.
Coercive tactics
No fabricated urgency, no manufactured social proof, no friction added to cancellation. Tactics that work by confusing people show up later as churn and complaints.
Where we have built this
Each one is written up in full, with its delivery stage stated plainly. Clients are described by industry only.
Data Driven Growth, answered
What teams usually ask before scoping this.
Then we say so and use methods that fit: cohort comparison, qualitative research, funnel instrumentation and sequential rollouts. Running an underpowered test and acting on it is worse than not testing.
Diagnosis is usually quick because it uses data you already have. How long a test takes depends on your volume and effect size, and we work that out before launching rather than afterwards.
We build the measurement foundation and design the tests, and we can build the changes where they are software. The strategic calls stay with your team.
We report it. That is usually the most valuable finding, and the one most likely to be uncomfortable.
Your team, with the experiment backlog, the definitions, the infrastructure and the record of what has already been tried documented at handover.
Related services
Scope a data driven growth build
Book a strategy call. We'll map the workflow, find the real bottleneck, and tell you honestly what should and should not be built.